Skip to content
Round above ground pool with a gray wall on a flat lawn in a fenced backyard
How-to guide: above ground pool installation

How to Set Up an Above Ground Pool: 12 Steps, Materials by Size and Time

How to set up an above ground pool: level the site within 1 inch, bolt the wall into its track, build a 6 x 6 inch cove, hang the liner above 70 F, then fill slowly while smoothing wrinkles.

Free Pool Quote Match

Tell us about your pool project. We match you with licensed local pros who cover your area.

Step 1 of 3: Your project

Free for homeownersNo obligationAbout 60 seconds

  • ✓Steps from 7 maker manualsEach step carries the measurement the Santorini, Doughboy, Islamorada, Imperial or Intex manual sets.
  • ✓Materials scaled 12 to 33 ftWall foam, foam cove pieces, cove sand, pad area, base sand and gallons for every round size.
  • ✓Time and cost, DIY vs pro10 minutes for an inflatable to 3 to 5 days for steel wall; installer labor $800 to $3,000.
Quick answer
Clear a circle 12 inches wider than the pool, dig it level within 1 inch, set the bottom track on patio blocks, bolt the wall, add 2 inches of sand and a 6 x 6 inch cove, hang the liner above 70 F, then fill. A steel-wall pool takes 3 people about half a day after leveling.
Within 1 in side to side
Level tolerance
About 1/2 day, 3 people
Assembly time
$800 to $3,000
Installer labor

Key takeaways

  • Steel-wall manuals require the pool area to be level within 1 inch side to side, reached by digging down, not filling (Santorini manual; Doughboy 573-3615).
  • Imperial Pools puts assembly at about half a day for at least 3 people, not counting earthwork and filling; Doughboy tells owners to plan 3 to 5 days for the whole job (Imperial Java manual, June 2023).
  • The cove is structural: Santorini specifies a 6 x 6 inch sand cove, Islamorada an 8 inch earth mound, and Imperial warns that a cove under 3 inches with a tight liner can buckle the wall (Imperial).
  • A 24 ft round needs 75.4 ft of wall foam (an 85 ft roll), 19 foam cove pieces and 13,594 gallons of water, about 15 to 19 hours through one garden hose (The Pool Factory; City of Akron).
  • Installer labor runs $800 to $3,000 on top of the pool, against $558 to $733 of add-on materials for a DIY 24 ft install (HomeGuide; PC&S arithmetic, November 2026).

How long does it take to set up an above ground pool?

From 10 minutes to 5 days, depending on the pool type. Intex lists 10 to 30 minutes for an Easy Set inflatable and 30 to 60 minutes for a Metal Frame pool. Imperial puts a steel or resin wall pool at about half a day for 3 people after the ground is level, and Doughboy tells owners to plan 3 to 5 days for the whole job.

Above ground pool setup time and crew size, as each manufacturer states it
Pool type and sourceAssembly time statedCrewWhat the time leaves outSource
Inflatable ring pool, 8 to 18 ft (Intex Easy Set)10 to 30 minutesAt least 2 personsSite clearing and fillingIntex Easy Set manual
Metal frame pool (Intex Metal Frame)30 to 60 minutes2 to 3 peopleLeveling and fillingIntex Metal Frame manual, 2022
Steel or resin wall, 12 to 30 ft (Imperial Java)About 1/2 dayAt least 3 peopleEarthwork and fillingImperial Pools manual, June 2023
Steel wall round (Doughboy)Plan 3 to 5 days2 or 3 helpersNothing: the whole jobDoughboy 573-3615
Steel wall, 12 to 30 ft (Islamorada)Not statedThree peopleIslamorada manual
Professional install (cost guide)1 to 3 daysInstaller crewDeck or fence built at the same timeHomeGuide, June 2024

Sources: Intex Easy Set manual; Intex Metal Frame manual (May 2022); Imperial Pools Java manual (June 2023); Doughboy 573-3615; Islamorada manual; HomeGuide (updated June 10, 2024). All opened November 9, 2026. Download CSV

The quoted times hide the slow parts. Imperial’s half day excludes earthwork and filling, and Intex’s 30 to 60 minutes assumes ground that is already absolutely level. Leveling a 26 ft circle by hand is usually the longest job; the dig-down method and its sand math are in our guide on how to level ground for an above ground pool.

Filling is the other long wait. A typical 5/8 inch garden hose delivers 12 to 15 gallons a minute (City of Highfill, Arkansas), so the 13,594 gallons in a 24 ft round with a 52 inch wall take 15.1 to 18.9 hours through one hose. Doughboy’s tools list includes 2 or 3 garden hoses for that reason. Fill times for every pool size, hose diameter, meter and water truck are in our guide on how long it takes to fill a pool.

Hours to fill a round above ground pool with one garden hose, by size52 in wall, City of Akron gallons, at 15 (low) and 12 (high) gallons per minute
Hours to fill a round above ground pool with one garden hose, by sizeRange chart: a 12 ft round fills in 3.8 to 4.7 hours, a 24 ft round in 15.1 to 18.9 hours and a 33 ft round in 28.6 to 35.7 hours with one hose.01020304012 ft: 3.8 to 4.712 ft15 ft: 5.9 to 7.415 ft18 ft: 9.6 to 11.918 ft21 ft: 11.6 to 14.521 ft24 ft: 15.1 to 18.924 ft27 ft: 19.1 to 23.927 ft30 ft: 23.6 to 29.530 ft33 ft: 28.6 to 35.733 ft

Source: City of Akron gallons table; City of Highfill, AR hose flow 12 to 15 gpm; PC&S arithmetic. Download chart data (CSV)

What tools and materials do you need to set up an above ground pool?

Hand tools plus four materials the kit does not include: washed sand for a 2 to 3 inch base, a cove, wall foam and patio blocks. Santorini’s list is a hammer, flat shovel, 12 ft 2×4, carpenter’s level, masonry string, stake, tamper, leveling rake, push broom, utility knife, spray paint, duct tape and clothes pins. The table scales each material by pool size.

  • Layout: a wooden stake, masonry string, a 25 ft tape (Doughboy) and spray paint to mark the circle.
  • Leveling: a straight 2×4, 12 ft long for Santorini’s pools, a carpenter’s level, a flat shovel, a tamper or sod roller.
  • Assembly: a #2 Phillips screwdriver (Santorini warns against power drivers near the liner), a 5/16 inch nut driver for Doughboy, pliers, duct tape and clothes pins or binder clips.
  • Base: a leveling rake, a push broom and a sifting screen; Doughboy screens out pebbles of 1/8 inch and larger.
  • Two sheets of 2 x 4 ft plywood to stand on and to unroll the wall on (Imperial).
Washed mason sand runs $40 to $110 per cubic yard before delivery (HomeGuide, June 2026); a 24 ft round with a foam cove takes about 2.50 cubic yards (The Pool Factory).
Washed mason sand runs $40 to $110 per cubic yard before delivery (HomeGuide, June 2026); a 24 ft round with a foam cove takes about 2.50 cubic yards (The Pool Factory).
Above ground pool setup materials by round pool size: wall foam, cove, sand and water
Round poolLevel area to clearWall length (circumference)Wall foam roll (Pool Factory / YourPoolHQ)Foam cove, 48 in piecesSand cove, 6 x 6 inFloor (pad) areaBase sand, sand cove / foam coveWater, 52 in wall
12 ft14 ft circle37.7 ft60 ft, 1 can / not listed104.7 cu ft113 sq ft1.00 / 0.75 cu yd3,398 gal
15 ft17 ft circle47.1 ft60 ft, 1 can / 60 ft125.9 cu ft177 sq ft1.50 / 1.00 cu yd5,310 gal
18 ft20 ft circle56.5 ft60 ft, 2 cans / 60 ft157.1 cu ft254 sq ft2.00 / 1.50 cu yd8,602 gal
21 ft23 ft circle66.0 ft85 ft, 2 cans / 75 ft178.2 cu ft346 sq ft2.50 / 2.00 cu yd10,408 gal
24 ft26 ft circle75.4 ft85 ft, 3 cans / 85 ft199.4 cu ft452 sq ft3.50 / 2.50 cu yd13,594 gal
27 ft29 ft circle84.8 ft85 ft, 3 cans / 100 ft2210.6 cu ft573 sq ft4.00 / 3.00 cu yd17,205 gal
30 ft32 ft circle94.2 ft105 ft, 3 cans / 100 ft2411.8 cu ft707 sq ft5.50 / 4.00 cu yd21,240 gal
33 ft35 ft circle103.7 ft105 ft, 4 cans / 2 x 60 ft2613.0 cu ft855 sq ft7.00 / 5.25 cu yd25,700 gal

Sources: wall foam rolls from The Pool Factory and YourPoolHQ; base sand from the Pool Factory sand chart; 6 x 6 in cove and 12 in clearance from the Santorini manual; gallons from the City of Akron table. Wall length, cove pieces, cove sand and floor area are PC&S arithmetic (3.1416 x diameter; area 3.1416 x radius squared). Accessed November 9, 2026. Download CSV

Two retailers disagree on wall foam for some sizes, and the arithmetic shows why. A 27 ft round has 84.8 ft of wall, so The Pool Factory’s 85 ft roll leaves about 2 inches spare while YourPoolHQ calls for a 100 ft roll. On a 21 ft round (66.0 ft of wall) YourPoolHQ’s 75 ft roll is enough and an 85 ft roll wastes 19 ft.

Base sand depends on the cove you choose. The Pool Factory’s chart lists 3.50 cubic yards for a 24 ft round with a sand cove and 2.50 with a foam cove, because the foam replaces sand at the wall. Our how to level ground for an above ground pool guide works the same sand from first principles: 3.14 cubic yards for a 2 inch base plus cove.

How to set up an above ground pool: 12 steps for a steel-wall pool

Check codes and utilities, mark and level the site, sink patio blocks, assemble the track, stand and bolt the wall, add wall foam, sand and cove, hang the liner, fit the top rails and uprights, then fill and cut in the skimmer. Each step below names the measurement and the manual it comes from.

  1. Check permits, power and utilitiesPools 24 in deep or more need a permit under IRC R105.2 where it is adopted. Contact 811 a few business days before digging; it is free. Keep outlets at least 5 ft from the wall (Islamorada).
  2. Pick and mark the siteDrive a center stake and paint a circle 12 in wider than the pool all round: a 13 ft string for a 24 ft pool (Santorini). No sudden slopes within 6 ft, no power lines overhead, no septic tank below (Doughboy, Santorini).
  3. Level to within 1 inStrip the sod, find the low spot with the 2×4 and level, and dig the high side down to it. Do not fill low areas (Santorini). Opposite sides must sit within 1 in.
  4. Sink the patio blocksSet one 8 x 8 x 2 in block under each upright, flush with the ground and level block to block: 12 for an 18 ft pool, 16 for a 24 ft pool (Santorini).
  5. Assemble the bottom trackJoin the rails with rail clips, leaving about 0.5 in between rails, and seat them in the bottom plates. Measure the diameter in several directions until it matches (Santorini).
  6. Stand and bolt the wallOn a calm day, start at the equipment side with the skimmer cutout at the top, unroll the wall clockwise into the track and bolt the seam with bolt heads inside. Tape over the bolts and recheck: no more than 1 in out side to side.
  7. Add wall foam (optional)Glue or duct-tape 1/8 x 48 in wall foam to the wall, starting at the top, so the cove hides the bare strip at the bottom (Pool Factory).
  8. Spread the sand and build the coveRake in at least 2 in of sifted sand, smooth it with a push broom, and form a 6 x 6 in cove against the wall (Santorini), or stick foam cove on top of 3 in of sand. Tamp or roll it.
  9. Hang the liner on a warm dayOpen the box without a knife, unfold the liner inside the pool above 70 F, center the floor seam in the cove and hold the top with clothes pins, working in 3 ft sections (Santorini).
  10. Fit top rails, plates and uprightsInstall the top wall rails with about 0.5 in gaps, top plates over the gaps, then each upright plumb with 6 bolts. Snap on the top rail caps (Santorini).
  11. Fill and smoothRun a hose in the center. Push wrinkles toward the wall once 1 to 2 in of water covers them, and never lift the liner with more than 4 in of water on it (Doughboy).
  12. Cut in the skimmer and return, then finish fillingWith a few inches of water in, screw the skimmer on by hand, then cut the liner inside its faceplate. Fill until the water is halfway up the skimmer opening (Santorini) and start the pump on a GFCI outlet.
The 12 setup steps for a steel-wall above ground pool, with the measurement each needs, from the Santorini, Doughboy and Islamorada manuals (accessed November 9, 2026).
The 12 setup steps for a steel-wall above ground pool, with the measurement each needs, from the Santorini, Doughboy and Islamorada manuals (accessed November 9, 2026).

Order matters more than speed. The Santorini manual asks you to decide where the filter and pump will sit before the wall goes up, because the wall seam must land on a bottom plate so an upright can cover the bolts (one of 16 uprights on a 24 ft pool), and the skimmer cutout sets where the plumbing runs. Moving the pump later means a hose across the yard. The liner-hanging steps for overlap, beaded and J-hook liners are covered in detail in our guide on how to install an above ground pool liner.

What goes under an above ground pool, and how big should the cove be?

Bare, compacted earth with the sod removed, then 2 to 3 inches of washed sand, a cove at the foot of the wall and an optional floor pad. The cove is the part people skip: Doughboy calls it vital, Islamorada says the maker cannot assume responsibility if it is omitted, and Imperial says a cove under 3 inches with a tight liner can buckle the wall.

Cove and base specification by manual
ManualCove materialCove sizeBase under the linerSource
Santorini AGP1800 / AGP2400Sifted sand6 x 6 inAt least 2 in of sifted sandSantorini manual
Islamorada roundScreened damp earth or pre-washed sand, over an optional wall guard8 in up, 8 in out2 to 3 in of sandIslamorada manual
Islamorada, EZ hook linerSame8 in cove required2 to 3 in of sandIslamorada manual
Imperial JavaSand, wetted and troweled, or styrofoam cove pieces3 to 6 in high, 8 to 12 in wideFine sand over compacted groundImperial Pools manual
Doughboy roundScreened damp earth or preformed cove; not sandPer cove makerPer manualDoughboy 573-3615
Pool Factory (Wilbar, Trendium, Trevi pools)Peel and stick foam cove3-3/4 in high on 3 in of sand3 in of sand, then a floor padThe Pool Factory

Sources: Santorini, Islamorada, Imperial Pools, Doughboy manuals; The Pool Factory for foam cove on Wilbar, Trendium and Trevi pools. Opened November 9, 2026. Download CSV

Base layers at the wall of a steel-wall pool: patio block, bottom track, wall foam, a 6 x 6 inch cove (Santorini) and a 2 inch sand base under the liner. Drawn from the Santorini and Islamorada manuals.
Base layers at the wall of a steel-wall pool: patio block, bottom track, wall foam, a 6 x 6 inch cove (Santorini) and a 2 inch sand base under the liner. Drawn from the Santorini and Islamorada manuals.

Guides disagree on the order of the layers. Royal Swimming Pools lists undisturbed earth, cove, sand base, pad and liner (Royal guide), while Santorini spreads the 2 inch base first and forms the cove from the same sand. Both end with the cove under the liner seam; follow your own pool’s manual, since Doughboy voids the warranty when its instructions are not followed.

A cove does two jobs. Doughboy says it keeps water pressure from forcing the liner out under the bottom rail, and Imperial adds that it shields the liner from the metal edges of the track. On a 24 ft round a 6 x 6 inch sand cove takes only 9.4 cubic feet of sand, about a third of a cubic yard, so cutting it short saves little.

How do you set up a frame or inflatable above ground pool?

On bare, compacted, absolutely level ground with no sand. Intex’s Metal Frame manual asks for 2 to 3 people and 30 to 60 minutes, and tells you to fill with no more than 1 inch of water first: if the water runs to one side, drain it and level again. An Easy Set inflatable takes 10 to 30 minutes and at least 2 people.

Steel wall vs metal frame vs inflatable: what setup takes
QuestionSteel or resin wallMetal frameInflatable ringSource
GroundBare earth dug level within 1 in, then sandCompacted, absolutely level; no sandFlat, level, clear of stonesSantorini; Intex manuals
Assembly time1/2 day to 3 to 5 days30 to 60 minutes10 to 30 minutesImperial; Doughboy; Intex
Crew3 people2 to 3 peopleAt least 2Imperial; Intex
CoveRequired: 6 x 6 in sand or foamNoneNoneSantorini; Intex
LinerSeparate vinyl liner hung on the wallBuilt inBuilt inSantorini; Intex
Level checkOpposite sides within 1 in1 in of water must not run to one sideFlat, level siteSantorini; Intex

Sources: Santorini manual; Imperial Pools manual; Doughboy manual; Intex Metal Frame manual; Intex Easy Set manual. Opened November 9, 2026. Download CSV

  1. Clear and level the groundRemove stones and branches; the ground must be compacted and level, not mud, sand or loose soil (Intex). Keep 4 ft clear of anything a child could climb.
  2. Spread the ground cloth and linerTwo people carry the liner; never drag it. Point the drain valve away from the house and the hose openings toward the outlet (Intex).
  3. Frame: push beams through the sleevesSlide the horizontal beams into the top sleeves, join them with T-joints, then fit the legs (Intex Metal Frame).
  4. Inflatable: pump up the top ringUse a hand pump, not an air compressor, which can burst the ring (Intex Easy Set).
  5. Test with 1 in of waterIf the water pools to one side, drain, level and refill. Then fill to just below the sleeve line on a frame pool (Intex).

Can you install an above ground pool by yourself, and what does a pro cost?

Yes, with helpers: no steel-wall manual we read suggests one person, and Imperial and Islamorada both call for three. For a 24 ft round, DIY add-on materials run about $558 to $733, while HomeGuide puts installer labor at $800 to $3,000 and Angi adds $1,000 to $3,400 when the yard needs professional leveling.

24 ft round above ground pool: DIY vs professional setup costs (kit price excluded)
Line item, 24 ft roundDIYProfessionalSource and date
Installer labor$0$800 to $3,000 (HomeGuide); $1,000 to $3,000 (Angi)HomeGuide, June 10, 2024; Angi, July 8, 2026
Professional leveling$0 (dig by hand)$1,000 to $3,400Angi, July 8, 2026
Wall foam, 85 ft roll$159.99Often in the installer's bidYourPoolHQ, November 9, 2026
Foam cove, 19 pieces$152.00Often in the installer's bidThe Pool Factory, November 9, 2026
Mason sand, 2.50 cu yd$100 to $275 plus deliverySame materialHomeGuide $40 to $110 per cu yd, June 3, 2026
Water, 13,594 gal$146.14$146.14PC&S fill cost research, October 2026
Permit$100 to $300$100 to $300Angi, July 8, 2026
Add-on materials total (excl. permit)$558 to $733Plus $800 to $6,400 labor and levelingPC&S arithmetic

Sources: HomeGuide above-ground pool cost (updated June 10, 2024); Angi (updated July 8, 2026, archived copy); YourPoolHQ and The Pool Factory listings (November 9, 2026); HomeGuide sand cost (June 3, 2026); PC&S cost to fill a pool research. Download CSV

24 ft round above ground pool: DIY add-on materials vs paying an installer, 2026US dollars; kit price not included
24 ft round above ground pool: DIY add-on materials vs paying an installer, 2026Range chart: DIY add-on materials run $558 to $733 for a 24 ft round, against $800 to $3,000 or $1,000 to $3,000 for installer labor and $1,000 to $3,400 for professional leveling.$0$1,000$2,000$3,000$4,000DIY add-on materials (foam, cove, sand, water): $558 to $733DIY add-on materials (foam, cove, sand, water)Installer labor (HomeGuide): $800 to $3,000Installer labor (HomeGuide)Installer labor (Angi): $1,000 to $3,000Installer labor (Angi)Professional leveling (Angi): $1,000 to $3,400Professional leveling (Angi)

Source: YourPoolHQ and The Pool Factory listings (Nov 9, 2026); HomeGuide (June 2024, June 2026); Angi (July 2026); PC&S arithmetic. Download chart data (CSV)

The DIY figure adds the 85 ft wall foam roll at $159.99, the 19-piece foam cove kit at $152.00, 2.50 cubic yards of mason sand at $40 to $110 a yard ($100 to $275) and 13,594 gallons of water at the $10.75 per 1,000 gallon median ($146.14). Patio blocks, delivery fees and tools are not included.

Hiring out does not remove your checks. Doughboy says it is not affiliated with any installer and tells owners to supervise a contractor’s work against the manual, and Islamorada limits its warranty to pools on level ground, treating more than 2 inches of slope wall to wall as off level. Ask an installer whether the bid includes leveling, sand, cove and the liner set, and whether they dig down or fill. Kit and add-on prices by pool size are in our above ground pool cost guide.

What permits, barriers and electrical rules apply before you set up?

Three checks before the dig: a building permit (the 2021 IRC exempts only prefabricated pools under 24 inches deep), a barrier (ISPSC 305.5 lets the pool wall count if its top is 48 inches above grade all round) and power (outlets at least 5 to 6 feet away, with GFCI protection on receptacles within 20 feet, per Islamorada and Intex).

  • Permit: under IRC R105.2 only prefabricated pools less than 24 inches deep skip the building permit, so a 48 or 52 inch wall pool usually needs one where the model code is adopted. Angi puts pool permits at $100 to $300.
  • Barrier: ISPSC 2024 Section 305.5 lets an onground pool wall serve as the barrier when its bottom sits on grade, its top stands at least 48 inches above grade for the whole perimeter, the maker allows it, and the ladder can be secured, locked or removed.
  • Digging: contact 811 a few business days ahead; the locate is free.
  • Power: Islamorada wants outlets at least 5 ft from the wall and a fixed or twist-lock GFCI connection from 5 to 10 ft; Intex puts the pool at least 6 ft from any receptacle and requires GFCI on 125 V, 15 and 20 A receptacles within 20 ft (Intex).

A 52 inch wall usually clears the 48 inch barrier height on flat ground, but recessing the pool changes that. Islamorada allows a 48 inch pool to be recessed 12 inches to keep 36 inches above ground, which then falls short of 48 inches and needs a separate barrier. Our pool fence cost guide prices one, and pool fence laws by state lists the states that require one.

What do you put in an above ground pool for the first time?

Fill it, run the filter, then test and balance before anyone swims. CDC guidance for home pools is a pH of 7.0 to 7.8 and free chlorine of at least 1 ppm, or at least 2 ppm when the water contains cyanuric acid stabilizer, tested at least twice a day. Doses depend on the gallons, so start from the Akron figure for your size.

  1. Finish the fillFill until the water is halfway up the skimmer opening (Santorini), with the filter and return fittings installed first.
  2. Start the pumpPlug the pump into a grounding-type GFCI receptacle, with no extension cord (Intex).
  3. Test pH and free chlorineAim for pH 7.0 to 7.8 and free chlorine of 1 ppm or more, 2 ppm or more with stabilizer (CDC).
  4. Dose by volumeUse your pool’s gallons: 13,594 for a 24 ft round with a 52 inch wall (City of Akron).

Our pool chemical levels chart lists every target range with its source, and how to test pool water explains strips versus drop kits. For a size other than 24 ft, the above ground pool sizes guide gives gallons for every round and oval. Source: CDC home pool water treatment.

A 24 ft round with a 52 inch wall holds 13,594 gallons in the City of Akron table, the figure to dose first-fill chemicals against.
A 24 ft round with a 52 inch wall holds 13,594 gallons in the City of Akron table, the figure to dose first-fill chemicals against.

Should you set up the pool yourself today, or wait?

Use the table: most setups fail on a slope, a cold liner day, a short crew or an outlet too close to the wall. Each row gives the trigger, the action and the manual or cost guide behind it, so you can decide before the sand truck arrives.

Above ground pool setup decision table
If your situation isDo thisWhy (source)
The yard falls more than about 6 in across the circle, or there is a slope within 6 ftHire leveling or pick another spotDoughboy: no sudden slopes within 6 ft; Angi prices leveling at $1,000 to $3,400
You have fewer than 3 people for wall dayWait, or book an installerImperial and Islamorada both call for three people; wind can fold an unbolted wall
Forecast is under 70 F on liner dayHang the liner on a warmer day, or sun it 1 to 2 hours firstSantorini: above 70 F; Channel-Lok: unfold on grass in the sun
Your liner is beaded or J-hook and is not sitting rightStop filling and refit before 4 in of waterDoughboy: do not lift the liner with more than 4 in of water
The pool is a frame or inflatable modelSkip sand and cove; level the bare ground and test with 1 in of waterIntex Metal Frame manual
The only outlet is closer than 5 to 6 ftHave an electrician add a GFCI outlet before the pump goes inIslamorada 5 ft; Intex 6 ft and GFCI within 20 ft
You plan a deck against the wallBuild it freestanding; read the deck guide firstWilbar and other warranties exclude attached decks

Sources: Doughboy, Imperial, Islamorada, Santorini, Channel-Lok and Intex manuals; Angi. The 6 inch fall threshold is a PC&S judgment call, not a manual figure. Download CSV

Worked example: everything a 24 ft round, 52 inch wall pool needs
Item24 ft round, 52 in wallArithmetic or ruleSource
Level area26 ft circle (13 ft string)radius 12 ft plus 12 inSantorini manual
Wall length75.4 ft3.1416 x 24PC&S arithmetic
Wall foam85 ft roll, 3 spray cans75.4 ft of wall, next roll size upPool Factory
Wall foam area302 sq ft75.4 ft x 4 ft highPC&S arithmetic
Foam cove19 pieces of 48 in75.4 / 4 = 18.85, round upPool Factory kit lists 19
Or a sand cove, 6 x 6 in9.4 cu ft (0.35 cu yd)0.5 x 0.5 / 2 x 75.4Santorini manual
Or an earth mound, 8 x 8 in16.8 cu ft (0.62 cu yd)0.667 x 0.667 / 2 x 75.4Islamorada manual
Floor pad or ground cloth452 sq ft3.1416 x 12 x 12PC&S arithmetic
Base sand3.50 cu yd with a sand cove, 2.50 with a foam coveretailer chartPool Factory
Patio blocks16 (8 x 8 x 2 in)one per uprightSantorini manual
Water13,594 galAkron table, 52 in wallCity of Akron
Fill time, one hose15.1 to 18.9 hours13,594 / 15 or 12 gpm / 60Highfill hose flow
Fill water cost$146.1413,594 / 1,000 x $10.75PC&S fill cost research

Sources: Santorini manual; Islamorada manual; Pool Factory wall foam guide; Pool Factory cove kit; City of Akron; City of Highfill; PC&S fill cost research. Download CSV

If a deck is next, build it freestanding: the Wilbar warranty, cited in our above ground pool deck guide, says the pool cannot support other construction and is void if decking is attached. Keep the pool’s 12 inch clear zone in the deck plan.

Above ground pool setup: the key numbers
NumberValueSource
Level tolerance, steel wallWithin 1 in side to sideSantorini; Doughboy
Level area beyond the wall12 in all roundSantorini; Islamorada
Sand base2 in minimum (Santorini); 2 to 3 in (Islamorada); 3 in (Pool Factory)Manuals; retailer guide
Cove6 x 6 in (Santorini); 8 x 8 in (Islamorada)Manuals
Liner day temperatureAbove 70 FSantorini
Crew3 peopleImperial; Islamorada
Time, steel wall1/2 day assembly; plan 3 to 5 days in allImperial; Doughboy
Water, 24 ft round, 52 in wall13,594 gal; 15.1 to 18.9 hours with one hoseCity of Akron; Highfill
Outlet distanceAt least 5 ft (Islamorada) or 6 ft (Intex)Manuals

Sources: Santorini, Doughboy, Islamorada, Imperial, Intex manuals; The Pool Factory; City of Akron; City of Highfill. Download CSV

How we compiled this

We read 7 manufacturer installation manuals (Santorini, Doughboy, Islamorada, Imperial Pools, Channel-Lok, Intex Metal Frame and Intex Easy Set), 3 retailer guides and listings, 2 cost guides, the City of Akron gallons table and the 2021 IRC and 2024 ISPSC text, all opened in November 2026. Material quantities are PC&S arithmetic from those inputs; we did not install a pool, and no figure comes from a forum or video.

Frequently Asked Questions

How do you prepare the ground for an above ground pool?

Mark a circle 12 inches wider than the pool, strip the sod, and dig the high side down until opposite sides sit within 1 inch of level; never fill low spots (Santorini). Sink a patio block under each upright, 16 on a 24 ft pool. The full method is in our guide on how to level ground for an above ground pool.

Can I install an above ground pool by myself?

Not alone. Imperial Pools says at least 3 people and about half a day once the ground is level, Islamorada says three people, and Doughboy suggests 2 or 3 helpers and 3 to 5 days in all. A frame pool needs 2 to 3 people (Intex). Installer labor costs $800 to $3,000 if you hire it out (HomeGuide, 2024).

What is the best thing to put underneath an above ground pool?

For steel or resin wall pools: compacted bare earth, then 2 to 3 inches of washed sand (Santorini, Islamorada), a 6 x 6 inch cove at the wall and an optional floor pad. Frame and inflatable pools go on compacted, level ground without sand, on the ground cloth that comes with the pool (Intex Metal Frame manual).

What chemicals do I put in my above ground pool for the first time?

Balance to the CDC targets for home pools: pH 7.0 to 7.8 and free chlorine of at least 1 ppm, or at least 2 ppm with cyanuric acid stabilizer, tested at least twice a day (CDC). Dose by gallons: a 24 ft round with a 52 inch wall holds 13,594 gallons (City of Akron).

How long does it take to set up an above ground pool?

Intex lists 10 to 30 minutes for an Easy Set inflatable and 30 to 60 minutes for a Metal Frame pool. A steel-wall pool takes about half a day for 3 people after leveling (Imperial), or 3 to 5 days for the whole job (Doughboy). Filling a 24 ft round with one hose adds 15 to 19 hours.

How much does above ground pool installation cost?

HomeGuide puts labor at $800 to $3,000 on top of a $800 to $4,500 pool, or $1,600 to $7,500 installed (June 2024). Angi adds $1,000 to $3,400 when the yard needs professional leveling (July 2026). Doing it yourself, a 24 ft round needs about $558 to $733 of foam, cove, sand and water.

Sources

  1. Santorini (hosted by The Home Depot). Santorini aboveground pool manual (AGP1800, AGP2400). Accessed 2026-11-09.
  2. Doughboy. Round pools assembly and installation instructions 573-3615. Accessed 2026-11-09.
  3. Pro Pools (host). Round above ground pool installation instructions (Islamorada). Accessed 2026-11-09.
  4. Imperial Pools. Java round installation manual (June 2023). Accessed 2026-11-09.
  5. Atlantic Pools (hosted by Pool Supplies). Channel-Lok 1 oval pools manual. Accessed 2026-11-09.
  6. Intex. Metal Frame Pool owner's manual (May 2022). Accessed 2026-11-09.
  7. Intex (ManualsLib copy). Easy Set pool owner's manual, page 9. Accessed 2026-11-09.
  8. The Pool Factory. Pool installation benefits when using wall foam. Accessed 2026-11-09.
  9. The Pool Factory. How to install an above ground pool like a pro. Accessed 2026-11-09.
  10. The Pool Factory. 24' round peel n' stick foam pool cove (Gladon XL). Accessed 2026-11-09.
  11. YourPoolHQ. Wall foam for above ground pool liners, 85 ft roll. Accessed 2026-11-09.
  12. City of Akron. How to calculate the gallons in a swimming pool. Accessed 2026-11-09.
  13. City of Highfill, Arkansas. Do-it-yourself residential customer water audit. Accessed 2026-11-09.
  14. HomeGuide. Above-ground pool cost. Accessed 2026-11-09.
  15. HomeGuide. Sand delivery cost. Accessed 2026-11-09.
  16. Angi. How much does installing an above-ground pool cost (archived July 2026 version). Accessed 2026-11-09.
  17. ICC via UpCodes. 2021 International Residential Code, Section R105.2. Accessed 2026-11-09.
  18. ICC via UpCodes. 2024 International Swimming Pool and Spa Code, Chapter 3. Accessed 2026-11-09.
  19. Common Ground Alliance. 811: know what's below. Accessed 2026-11-09.
  20. CDC. Home pool and hot tub water treatment and testing. Accessed 2026-11-09.
  21. Royal Swimming Pools. Round above ground pool installation guide. Accessed 2026-11-09.
Free for homeowners

Get Quotes From Licensed Local Pool Pros

Tell us what you need and your ZIP code. We match you with pool companies that cover your area.